Wellington Dock Lock Gates Fender Upgrades
Essential maintenance was required, by Dover Harbour Board (DHB), to perform necessary fender upgrades to both sides of the lock gates of the Wellington Dock at Dover.
Working within the tidal restrictions R&B Engineering Ltd were commissioned to complete the task of removing the existing sheet piles that protruded the Navigational lock gates prior to installing vertical rubber fenders to protect boat movements in and out of the Dock.